Grouts & Anchors · Towers & Apartments
Post-tensioned cable duct grouting
Post-tensioned slab ducts must be filled fully with a stable grout or the tendons corrode in the voids. Open a system for the build-up, documents and specification.
General-duty anchoring
Post-tensioned cable duct grouting
Precast concrete unit joints
Curtain wall bracket anchors
Bearings & base plates
Anchors, dowels & fixings
Our pick for this place
For EN 447 compliance required.
Cementitious Grouts(1)
Grout Additives & Admixtures(1)
Not finding the right fit?Tell us about the towers & apartments project and we'll come back with a recommendation.
Ask DCP