Stadium 974

600 mm deep-pour precision grout, without added aggregate, for the steel roof base plates

Project type
Stadiums, Modular Buildings
Location
Doha, Qatar
Year
2025
Products
Flo-Grout BP800
Stadium 974, built from shipping containers and a steel frame (open the photo larger)
Stadium 974, built from shipping containers and a steel frame

The challenge

Stadium 974 is a 40,000-seat stadium near Doha Port and Hamad International Airport, built for the FIFA World Cup. It is a demountable stadium built from repurposed shipping containers and prefabricated steel. The steel roof is anchored to the reinforced concrete foundation with large base plates and dense bolt groups. The grout had to flow through narrow, congested bolt patterns, bond as one mass in 600 mm deep layers, stay dimensionally stable under high loads and control curing heat to avoid thermal cracking. Grouting was on the critical path, because roof erection depended on the grout in the shear key zones curing on time.

The DCP solution

DCP recommended Flo-Grout BP800, a high-performance, non-shrink precision grout for heavy-duty and deep-pour structural work. It offers high flow and structural performance for deep pours, dense bolt layouts and high loads. Mock-up trials checked grout behaviour, heat, bond and setting time before work started. The grout was placed without added aggregate so it could flow through the dense bolts, and heat was managed by pouring in layers.

DCP products used

Grouts and anchors Flo-Grout BP800 Non shrink cementitious bearing pads precision grout Product page: Flo-Grout BP800Specifications: Flo-Grout BP800

How it was applied

  1. Run mock-up trials to check flow, heat, bond and setting time.
  2. Pour Flo-Grout BP800 in three layers, with 90 minutes between layers to let heat dissipate while keeping a monolithic bond.
  3. Leave out aggregate to keep flow through bolt groups of up to 14 bolts of 40 mm per plate.
  4. Monitor placement, flow, encapsulation and curing on site throughout.

The result

The grout fully encapsulated all base plates and anchor bolts at 600 mm depth without added aggregate. It transferred the vertical, shear and bending loads from the roof, and no thermal cracking or dimensional instability occurred.

More photos

Roof base plate and shear key assembly before grouting (open the photo larger)
Roof base plate and shear key assembly before grouting
Roof base plate with dense anchor bolt pattern on site (open the photo larger)
Roof base plate with dense anchor bolt pattern on site
Grouting works at a roof base plate (open the photo larger)
Grouting works at a roof base plate